Pandemic Predicament: Church Design – Part 4 of 5

Pandemic Predicament: Church Design – Part 4 of 5

Pandemic Predicament: Church Design – Part 4 of 5

The COVID-19 pandemic has redefined daily life. From working environments to required face coverings to food delivery to entertainment, the effects and aftermath of social distancing may be here to stay for a very long time. These are unchartered waters and architecturally speaking, will no doubt have an impact on the design of future gathering spaces. Therefore, it is incumbent on the architectural community to look for ways to not only mitigate virus transmission, but to design safer gathering spaces.

In this blog post series, we’ll look at several key areas within the church campus where design can have a major impact on the occupants’ safety and protection from transmitting and/or contracting COVID-19 or other viruses.

As churches begin to reopen, federal, state, city and county health and safety guidelines are in place to help prevent new cases of COVID-19. But beyond best-practices of hand sanitizer stations, daily deep cleaning, and seating people six feet apart, what else is worth considering in terms of indoor spaces.

Continue Reading

Pandemic Predicament: Church Design – Part 3 of 5

Pandemic Predicament: Church Design – Part 3 of 5

Pandemic Predicament: Church Design – Part 3 of 5

The COVID-19 pandemic has redefined daily life. From working environments to required face coverings to food delivery to entertainment, the effects and aftermath of social distancing may be here to stay for a very long time. These are unchartered waters and architecturally speaking, will no doubt have an impact on the design of future gathering spaces. Therefore, it is incumbent on the architectural community to look for ways to not only mitigate virus transmission, but to design safer gathering spaces.

Continue Reading

Christ Community Church Completes Construction

Christ Community Church Completes Construction

Christ Community Church’s Downtown Campus serves the Crossroads District, the center of the arts community, in Downtown Kansas City. The church is an intergenerational collection of individuals and families from different communities purposed for the flourishing of Downtown KC.

Over the last several years, the church has accomplished its ministry out of a leased facility. As the church outgrew this space, they began searching for a facility that they could own and that would better accommodate their immediate and future needs. After researching several different options, the church identified a 2-story 20,000 square foot building located at 208 West 19th Street in Kansas City, Missouri as a potential new home.

Continue reading

Rev City Completes Construction

Rev City Completes Construction

Rev City Church is a non-denominational Christian church in Lawrence, KS. The church selected Mantel Teter to serve ministry and space need redevelopment, and to help renovate the exterior of their facility.

The existing facility was lacking in community space, and the look and feel of the interior did not reflect the current DNA of Rev City Church. Through creative interior renovations, and modifications to the dated exterior, Mantel Teter helped provide exciting renovations to their children’s ministry classrooms, and expanded their existing lobby to provide much needed community and connection space. The exterior now boasts a drop-off canopy, and exterior café seating that connects directly to the expanded lobby. New glass walls along the lobby renovation provide connection and visibility from the exterior, allowing people to see the exciting things happening at Rev City Church.

View more photos

Mantel Teter Transitions to Virtual Office

Mantel Teter Transitions to Virtual Office

On January 1, 2021, Mantel Teter celebrates 60 years in business!

After all those years of maintaining a traditional office structure, Mantel Teter decided in 2021 to transition to an innovative “virtual office” structure. Through creative technology, our team is now based out of their personal offices, allowing our staff size to efficiently increase with larger workloads. Smaller overhead and more nimble staff allows for more individualized care and attention to our clients.

It’s business as usual and the brand experience remains the same. We simply no longer have a single physical office where we all gather. However, our team work and collaboration has never been better. The personal attention and creative solutions that so many of our clients love, well that continues to be our highest value and is stronger than ever! Although we’ve already been doing it the last 9 months due to COVID-19, we’re excited about innovating and leveraging this new virtual office structure.

You can still call us, email us, and even video call us, the same as you’ve always done, but please update your contact correspondence for us. Our new mailing address is:

5013 N Washington Street

Gladstone, Missouri 64118

Pandemic Predicament: Church Design – Part 2 of 5

Pandemic Predicament: Church Design – Part 2 of 5

Pandemic Predicament: Church Design – Part 2 of 5 Considerations for the Lobby & Common Areas:

The COVID-19 pandemic has redefined daily life. From working environments to required face coverings to food delivery to entertainment, the effects and aftermath of social distancing may be here to stay for a very long time. These are unchartered waters and architecturally speaking, will no doubt have an impact on the design of future gathering spaces. Therefore, it is incumbent on the architectural community to look for ways to not only mitigate virus transmission, but to design safer gathering spaces.

Continue reading

Living Faith Church Selects Architect

Living Faith Church - located in Lee’s Summit, Missouri, recently acquired an existing church facility and property. They have selected Kansas City, Missouri based architect Mantel Teter to lead them through a metrics analysis, discovery of space use, and design process to update their campus master plan and add facilities. Immediate facility needs include parking, additional space for lobby & gathering and NextGen ministry spaces to balance with the new future Sanctuary seating capacity. Homoly Construction was selected to serve as the general contractor. "This church has unique strategies for reaching their community in southern Lee’s Summit and it’s impacting their building needs in a very positive way. We’re excited to partner with this church & help them develop and design new and renovated facilities." shared Brian Rathsam, Project Architect for the project.

Living Hope Church Selects Architect

Living Hope Church - located in Olathe, Kansas, recently selected Kansas City, Missouri based architect Mantel Teter to lead them through a metrics analysis, discovery of space use, and design process to update their campus master plan and add facilities. Immediate facility needs include a new Sanctuary, additional space for lobby & gathering, and NextGen ministry spaces to balance with the new Sanctuary seating capacity. Universal Construction was selected to serve as the general contractor. "Our team is honored to partner with this church & help them develop and design new facilities that will create impact for the Kingdom." shared Brian Rathsam, Project Architect for the project.

Grace Baptist Church Selects Architect

Grace Baptist Church - located in Manhattan, Kansas, recently selected Kansas City, Missouri based architect Mantel Teter to lead them through a metrics analysis, space use discovery and design process to update their campus master plan and add facilities. Immediate facility needs include additional space for lobby & gathering and NextGen ministry spaces to balance with the Sanctuary seating capacity. "Our team is excited to partner with this great church & develop an updated master plan and design new and renovated facilities to help them impact the Kingdom." stated David Evans, Principal for the project.

Pandemic Predicament: Church Design – Part 1 of 5

Pandemic Predicament: Church Design – Part 1 of 5

Pandemic Predicament: Church Design – Part 2 of 5 Considerations for the Church Property

The COVID-19 pandemic has redefined daily life. From working environments to required face coverings to food delivery to entertainment, the effects and aftermath of social distancing may be here to stay for a very long time. These are unchartered waters and architecturally speaking, will no doubt have an impact on the design of future gathering spaces. Therefore, it is incumbent on the architectural community to look for ways to not only mitigate virus transmission, but to design safer gathering spaces.

Continue reading

Lawson Assembly of God Breaks Ground

Lawson Assembly of God Breaks Ground

Lawson Assembly of God breaks ground on their 500 seat sanctuary/multi-purpose room and lobby addition!

Taking Church Outside

Taking Church Outside

The COVID-19 pandemic has redefined daily life. From working environments to required face coverings to food delivery to entertainment, the effects and aftermath of social distancing may be here for a very long time. These are uncharted waters and architecturally speaking, will no doubt have an impact on the design of future gathering spaces. Therefore, it is incumbent on the architectural community to look for ways to not only mitigate virus transmission, but to design safer gathering spaces.

As the current stay-in-place culture wears on (and wears thin), people are understandably looking for different ways to cope. Heading outside is becoming a popular way to reduce cabin fever. From community concerts held outdoors, musicians performing in courtyards at restaurants and bars, drive-in theaters, and even pop-up concerts on front yards, socially responsible activities happening outside are a growing trend.

As churches begin to reopen, health and safety guidelines are in place to help prevent new cases of COVID-19. But beyond best-practices of hand sanitizer stations, deep cleaning, and seating people six feet apart, the act of taking worship outside is worth considering.

Continue reading

LifePoint Church Completes Construction

LifePoint Church Completes Construction

LifePoint Church - located in Smyrna, Tennessee, has finished renovations to their existing facilities with the design and construction team of Mantel Teter and Dow Smith Company. Immediate facility needs included consolidation of staff offices, better configured children’s ministry space and student ministry space, and improving overall security and wayfinding/connection throughout the facility. We were honored to serve this church!

Image Credit Emmalee Schaumburg

Christ Community Church is Taking Shape

Christ Community Church is Taking Shape

Christ Community Church is starting to shape up! Construction on this 2-story 20,000 square foot building to will be completed mid-October. Check out the latest construction photos of this project located in Downtown Kansas City.

Manna Fellowship Church Dedicates Multi-Purpose Building

Manna Fellowship Church Dedicates Multi-Purpose Building

Earlier this month, Manna Church, located in Pleasant Hill, Missouri, dedicated their new multi-purpose building which includes a 600-seat worship space, fellowship/connection space, classrooms and offices. We enjoyed serving this church!

Community Church Completes Construction

Community Church Completes Construction

Community Church is a bible-based evangelical Christian church with two campus locations, Greensburg, IN and Batesville, IN. The church selected Mantel Teter to serve ministry and space needs at both campuses, with a major focus on the Batesville campus. Unique to this campus is its location context. The church purchased an early circa 1900’s building with historical value in the downtown core of Batesville.

Fellowship Bible Church Begins Construction

Fellowship Bible Church Begins Construction

Fellowship Bible Church, located in Murfreesboro, Tennessee is starting construction on their Phase 2 Children's Building addition which will provide additional classrooms, a large group auditorium for kids and other ministry groups, additional office space, and a renovated and enlarged lounge area for hospitality and gathering. The church returned to their original design build team of Mantel Teter and Dow Smith Construction.

Christ Community Church Construction Progress

Christ Community Church Construction Progress

Christ Community Church’s Downtown Campus is currently occupying leased space located in the Crossroads District, the center of the arts community in Downtown Kansas City. The church is an intergenerational collection of individuals and families from different communities purposed for the flourishing of Downtown KC.

As the church began to run out of space, they began searching for other facility options that would better accommodate their current and future needs. After researching several different location, the church identified a 2-story 20,000 square foot building located at 208 West 19th Street in Kansas City, Missouri as a potential new home.

Continue reading

Manna Fellowship Church Construction Progress

Manna Fellowship Church Construction Progress

Kansas City, Missouri’s Crosspointe Baptist Church joined forces with Belton, Missouri’s Manna Fellowship Church, who relocated to a leased facility near the intersection of 58 highway and 291 highway east of Raymore, Missouri. The church’s mission is to “…elevate God in our personal lives, church, community and world.

The newly formed church experienced explosive growth that put pressure on the facility’s ability to support ministry. With the desire to provide facilities that would support further growth, the church selected Mantel Teter as their partner in discovering the facility type, size and location that would meet their immediate and future needs.

Continue reading

Construction Progress at Evangel Temple

Construction Progress at Evangel Temple

Taking advantage of the current environment surrounding COVID-19, with church services being held online only, Evangel Church has begun construction on their platform and back-of-house remodel. The new elevated platform is backed with a 36’ wide video screen wall, with updated sound system and room acoustics. The back of house now includes a green room, production suite, and ample side-wing storage with direct access to the platform. The goal is to be complete when services are once again held onsite!