Westside Family Care Center has gone vertical and is beginning to take shape.  A bit of luck with a few warm weather days, and creative scheduling by the team at Pearce Construction, allowed the second-floor slab to be poured, keeping construction moving steadily forward.  Metal roof decking has been set, and exterior walls are being installed in hopes that construction can continue to run smoothly with interior wall framing soon to follow.