While not the architects for the original first phase of the church, Mantel Teter Architects was selected for the updated master plan and design of the recently completed second phase. Our design team worked with the senior staff and various ministry groups in the church through a series of programming workshops to determine the vision of the church and to formulate strategies for updating the church’s campus master plan. A written program with a site analysis, feasibility study and financial models was provided.
Second Phase improvements and additions include an expanded fellowship foyer with a welcome center and bookstore; themed nursery, preschool and youth facilities; youth auditorium and gymnasium, connections cafe and adult education space. Phase Three of our revised master plan expands the current church seating capacity from 1850 to 3000. read more >>
1600 North 291 Highway
Liberty, Missouri
93,000 S.F.
Programming
Master Planning
Architectural
Civil Engineering
Structural Engineering
M/E Engineering
Interior Design
Acoustical Design
Cost Estimating
Construction Administration
Cheryl Kohlsteadt, Administrator
816.781.5959
“We were most interested in function, but we also wanted an attractive facility. We believe Mantel & Teter effectively led us to reach that goal. We also greatly appreciate the quick response from David Evans to questions and concerns that arose during construction.”
Cheryl Kohlsteadt, Administrator
Pleasant Valley Baptist Church
copyright 2009 - 2010 Mantel Teter Architects | 929 Walnut Street, Suite 700 Kansas City, MO
developed by upside down design