This old historic downtown Kearney church is faced with limited land for expansion while dealing with very difficult deed restrictions for their existing property. However, the church continues to grow and face overcrowding issues. Upon acquiring a new 10 acre piece of property south of downtown, the church selected Mantel Teter Architects to work with the building committee and various ministry groups in the church through programming workshops to cast the vision of the church’s relocation. Together, we created a written program document; new four phase campus master plan, site analysis, financial models, and cost estimates. We assisted the church in developing a plan based on the prioritization of needs. read more >>
Highway 33 & 21st Street
Kearney, Missouri
11,500 S.F.
Programming
Master Planning
Architectural
Civil Engineering
Structural Engineering
Interior Design
Acoustical Design
Technical Systems Design
Cost Estimating
Doug Gilpin, Senior Pastor
816.628.5583
“From the original dream to receiving a permanent occupancy permit, every step and every player is crucial. Thank you for being on our team. Thank you for being on God’s team. We could not have finished the game without you.
Our new building is already proving to be a great tool in touching lives for Christ, beginning with our own, then lives in our community, and even around the world.”